Skip to content
MYDA GroupGROUP
Audits & Advisory

Industrial Water Audit

Measure every drop, cut consumption and meet CGWA and ZLD obligations.

Professional fee
From ₹50,000
Govt. fees extra
Turnaround
15–30 days
Working days, typical
Authority
MYDA Group (independent assessment); audit reports submitted to CGWA / State Ground Water Authority and SPCB where required
Validity
Annual for CGWA-regulated users; otherwise recommended every 1–2 years

Water is now a regulated, priced and reputational resource for Indian industry. CGWA guidelines require larger groundwater users to conduct annual water audits and reduce consumption, SPCBs push zero liquid discharge and reuse, and BRSR demands water-footprint disclosure. Our water audit maps your complete water balance from intake to discharge, identifies losses and reuse opportunities, and delivers a conservation plan that satisfies regulators and lowers cost.

Legal basis: CGWA Guidelines to regulate and control ground water extraction, 2020 (annual water audit and consumption-reduction obligations for larger abstractors, through auditors certified by bodies such as CII, FICCI or NPC); Water (Prevention and Control of Pollution) Act, 1974 consent conditions; CPCB / SPCB directions on zero liquid discharge and water reuse for notified sectors; SEBI BRSR Core water-footprint KPIs

Who needs it

  • Industries abstracting groundwater above the thresholds in the CGWA 2020 guidelines, which must undertake annual water audits and cut use by the stipulated percentage
  • Textile, dyeing, pharma, chemical, pulp and paper, distillery and tannery units under ZLD or stringent discharge norms
  • Food and beverage, dairy and packaged drinking water plants with high water intensity
  • Listed companies reporting water withdrawal, consumption, intensity and discharge in BRSR Core
  • Hotels, hospitals, campuses and real-estate projects with STP reuse mandates from local bodies
  • Plants in water-stressed districts facing supply curtailment or community pressure

Common in:Manufacturing & Industrial UnitsPharma & ChemicalsHospitals & HealthcareReal Estate & Infrastructure

Documents required

  1. 1Water source details: borewells, municipal / industrial-estate supply, surface water and tankers with quantities and costs
  2. 2Existing flow meter locations, readings and calibration records
  3. 3Process flow diagrams and water-using equipment list (cooling towers, boilers, washing, process, domestic, gardening)
  4. 4ETP / STP design capacity, inlet and outlet quantities and treated water reuse records
  5. 5Effluent discharge quantities and quality reports as per consent
  6. 6CGWA / State groundwater NOC with conditions and previous water audit reports
  7. 7Production data for water intensity benchmarking
  8. 8Rainwater harvesting and recharge structures with design capacity
  9. 9Utility bills and chemical consumption for water treatment

Missing something? We help you obtain or regularise supporting documents before filing.

How we get it done

  1. 1

    Pre-audit data review

    Week 1

    We study the water sources, consent conditions, NOC obligations and existing metering, and design the measurement plan including temporary ultrasonic flow metering where meters are missing.

  2. 2

    Field measurement

    Week 1–2

    Flows are measured at intake, each major user, recycling loops and discharge; cooling tower cycles, boiler blowdown and losses are quantified over representative shifts.

  3. 3

    Water balance and benchmarking

    Week 2–3

    A closed water balance is prepared, unaccounted-for water is identified and specific water consumption is benchmarked against sector norms and CPCB / CII references.

  4. 4

    Conservation plan and report

    Week 3–4

    Measures are ranked by savings, cost and payback — leak repair, cooling tower optimisation, process reuse, treated-water recycling, rainwater harvesting — and compiled into the audit report in the format required by CGWA and management.

If you don’t comply

Failure to conduct and submit the mandatory water audit, or to achieve the consumption reduction required under the CGWA 2020 guidelines, is a breach of NOC conditions that can lead to non-renewal, environmental compensation and prosecution under Section 15 of the Environment (Protection) Act, 1986. SPCBs can also impose closure directions for exceeding consented water intake or discharge. Beyond penalties, unmeasured water is unmanaged cost and a growing supply risk in stressed districts.

Why MYDA Group

  • Specialists, not generalists

    Environmental compliance is our only practice, so your file is handled by people who do this every day.

  • Fixed fee, written scope

    You know the professional fee and the statutory fees before we start. No surprise add-ons.

  • Inspection and audit-ready

    We prepare your site and team for the board visit or certification audit and attend it with you.

  • Lifetime reminders

    Every condition, return and renewal goes into your compliance calendar with alerts.

Frequently asked questions

Who is required to conduct a water audit under the CGWA guidelines?

The 2020 guidelines require industries, infrastructure and mining projects abstracting groundwater above specified daily quantities (which vary with the stress category of the assessment unit) to conduct annual water audits through auditors certified by recognised bodies such as CII, FICCI or NPC, submit the reports and reduce groundwater use by the stipulated percentage within a set period. We confirm the exact thresholds and obligations applicable to your NOC.

What is a water balance and why does it matter?

A water balance accounts for every cubic metre entering the site and where it goes — product, evaporation, effluent, reuse and losses. A good audit closes the balance to within about 5 to 10 percent; the unaccounted gap usually reveals leaks, overflowing tanks and unmetered uses that are the cheapest savings available.

What is Zero Liquid Discharge and does it apply to us?

ZLD means no liquid effluent leaves the site — all wastewater is treated and reused, with residual salts recovered as solids. CPCB and several SPCBs have mandated ZLD for sectors such as textile dyeing, distilleries, tanneries and certain chemical and pharma clusters, and for units in specific river basins. A water audit is the first step, because reducing intake and segregating streams cuts the size and cost of ZLD systems dramatically.

Does the audit also cover water quality?

Our standard audit focuses on quantity and reuse, but we review effluent and treated-water quality data to assess reuse feasibility and consent compliance, and we can add sampling for specific parameters where required for reuse applications or ZLD design.

Often needed alongside

EIA & Clearances

Groundwater Abstraction NOC (CGWA)

Industries, infrastructure projects and mines that draw groundwater through borewells or tubewells need a No Objection Certificate from the Central Ground Water Authority or the State Ground Water Authority. We assess the status of your assessment unit, prepare the application on the NOCAP portal with the hydrogeological report, metering and recharge plan, and manage compliance conditions and renewals.

Starting price
From ₹30,000
Turnaround
45–90 working days

Pollution Control

Consent to Operate (CTO)

Consent to Operate is the SPCB's permission to run your plant, discharge treated effluent and emit through approved stacks. It also fixes the production capacity, fuel, water use and monitoring conditions you will be held to. We prepare the application, get your monitoring done by recognised labs and manage the inspection so production starts on schedule.

Starting price
From ₹20,000
Turnaround
30–90 working days

Audits & Advisory

Energy Audit (BEE Accredited)

An energy audit is the most reliable way to cut operating cost and emissions at the same time, and for Designated Consumers under the Energy Conservation Act it is a statutory obligation. We carry out detailed energy audits through BEE-accredited energy auditors, benchmark your specific energy consumption, and deliver a costed list of energy conservation measures with the documentation needed for PAT compliance, BRSR energy KPIs and your carbon footprint.

Starting price
From ₹60,000
Turnaround
15–30 working days