Consent to Establish (CTE)

Get your SPCB Consent to Establish before you break ground — filed right the first time.

Professional fee
From ₹20,000
Govt. fees extra
Turnaround
30–75 days
Working days, typical
Authority
State Pollution Control Board (SPCB) / Pollution Control Committee (PCC) in Union Territories
Validity
Till commissioning of the unit — typically 1 to 5 years depending on category and state policy, extendable on application

The Consent to Establish (CTE), also called the NOC to establish, is the first statutory clearance any new or expanding industry needs from its State Pollution Control Board before construction, land development or equipment installation begins. We categorise your unit correctly, build the technical file and handle the OCMMS filing and follow-up through to grant.

Legal basis: Section 25 of the Water (Prevention and Control of Pollution) Act, 1974 and Section 21 of the Air (Prevention and Control of Pollution) Act, 1981

Who needs it

  • New manufacturing units in the Red, Orange or Green category before any construction starts
  • Existing units planning expansion, modernisation or a change in products or production capacity
  • Hospitals, hotels, large residential and commercial building projects above state-notified thresholds
  • Infrastructure such as STPs, CETPs, DG-set installations and bulk storage terminals
  • Pharma, chemical and food processing units relocating to a new site or industrial estate
  • Any unit that will discharge effluent, emit to air or generate hazardous waste

Common in:Manufacturing & Industrial UnitsPharma & ChemicalsHospitals & HealthcareReal Estate & Infrastructure

Documents required

  1. 1Detailed project report with process description, product list and installed capacity
  2. 2Site plan and plant layout showing stacks, ETP/STP, hazardous waste storage and green belt
  3. 3Land documents — sale deed, lease deed or industrial estate allotment letter — and land-use / zoning certificate
  4. 4Process flow diagram with material and water balance
  5. 5Details of proposed air pollution control devices and effluent treatment scheme
  6. 6Chartered Accountant certificate of proposed capital investment (land, building, plant and machinery) for fee computation
  7. 7Constitution documents — Certificate of Incorporation / Partnership Deed / MoA and AoA
  8. 8Udyam (MSME) registration, PAN and GST certificates
  9. 9Environmental Clearance, if the project is covered under the EIA Notification, 2006
  10. 10Board resolution or authorisation letter naming the authorised signatory

Missing something? We help you obtain or regularise supporting documents before filing.

How we get it done

  1. 1

    Categorisation and fee working

    Day 1–2

    We confirm your Red / Orange / Green / White category under the CPCB classification, compute the consent fee from your capital investment and check whether an Environmental Clearance or other pre-condition applies.

  2. 2

    Technical file preparation

    Day 3–7

    We draft the process description, water and material balance, pollution load estimates and the proposed treatment and control scheme in the format your SPCB expects.

  3. 3

    Online filing on the state portal

    Day 8–10

    The application is filed on the state OCMMS or equivalent online consent portal with all annexures, and the statutory fee is paid.

  4. 4

    Query response and site inspection

    Day 11–40

    We answer technical queries raised by the Regional Office and coordinate the site visit, if one is scheduled, so the inspecting officer gets a clean file.

  5. 5

    Grant and condition review

    Day 40–60

    Once the CTE is issued we review every condition with you so that the design of your ETP, stacks and storage areas matches what the Board has approved.

If you don’t comply

Establishing an industry without CTE is a violation of Section 25/26 of the Water Act and Section 21 of the Air Act. After the Jan Vishwas (Amendment of Provisions) Act, 2023 and the Water (Prevention and Control of Pollution) Amendment Act, 2024, this attracts monetary penalties of ₹10,000 up to ₹15 lakh with additional daily penalties for continuing contravention, alongside closure or power and water disconnection directions under Section 33A / 31A and Environmental Compensation levied by the SPCB.

Why MYDA Group

  • Specialists, not generalists

    Environmental compliance is our only practice, so your file is handled by people who do this every day.

  • Fixed fee, written scope

    You know the professional fee and the statutory fees before we start. No surprise add-ons.

  • Inspection and audit-ready

    We prepare your site and team for the board visit or certification audit and attend it with you.

  • Lifetime reminders

    Every condition, return and renewal goes into your compliance calendar with alerts.

Frequently asked questions

What is the difference between Consent to Establish and Consent to Operate?

CTE is permission to set up — it must be obtained before you start construction or install machinery. CTO is permission to run — it is applied for once the unit is built and pollution control systems are in place. You cannot apply for CTO without a valid CTE, so timing matters.

How is the CTE fee calculated?

Most SPCBs charge a slab-based fee linked to the gross capital investment in land, building, plant and machinery, with higher slabs for Red category units. A Chartered Accountant's certificate of investment is therefore a core document, and we help you declare it correctly so the fee is neither over- nor under-paid.

How long does an SPCB take to issue a CTE?

Most states commit to 30 to 120 days under their citizen charter or ease-of-doing-business reforms, with Green category applications moving fastest. Delays almost always come from incomplete technical files or unanswered queries, which is exactly what we manage for you.

Does a White category unit need a CTE?

No. Units in the White category (for example assembly of certain electronic items, or cotton and woollen hosiery without dyeing) are exempt from the consent mechanism and only need to intimate the SPCB. We will confirm your category before you spend money on a full application.

Can the CTE be transferred if the company name or ownership changes?

Yes, most Boards allow a change of name or transfer of consent on application with the amended constitution documents and an undertaking. Any change in process, capacity or location, however, needs a fresh or amended CTE.

Often needed alongside

Pollution Control

Consent to Operate (CTO)

Consent to Operate is the SPCB's permission to run your plant, discharge treated effluent and emit through approved stacks. It also fixes the production capacity, fuel, water use and monitoring conditions you will be held to. We prepare the application, get your monitoring done by recognised labs and manage the inspection so production starts on schedule.

Starting price
From ₹20,000
Turnaround
30–90 working days

EIA & Clearances

Environmental Clearance (EC)

Prior Environmental Clearance is the statutory permission for any project listed in the EIA Notification, 2006 before construction or expansion begins. Whether your project is appraised centrally by the MoEFCC or by your State authority, we prepare the application on PARIVESH, present it to the committee, respond to each query and track the clearance until the letter is issued and conditions are mapped for compliance.

Starting price
From ₹3,00,000
Turnaround
90–240 working days

Pollution Control

Fire NOC (Fire Safety Certificate)

The Fire NOC, issued by the State Fire and Emergency Services Department, certifies that your building or factory meets the fire prevention and life safety norms of the National Building Code and the state Fire Act. A provisional NOC is needed at the building-plan stage and a final NOC before occupation or operation. We coordinate the fire-fighting layout, documentation and inspection so your project, factory licence and insurance are not held up.

Starting price
From ₹20,000
Turnaround
15–45 working days