TSDF Authorization (Treatment, Storage & Disposal Facility)

Common or captive TSDF — from siting and EC to Form 2 authorisation and operation.

Professional fee
From ₹1,50,000
Govt. fees extra
Turnaround
120–365 days
Working days, typical
Authority
State Pollution Control Board (authorisation and consents), MoEFCC / SEIAA (Environmental Clearance), CPCB (guidelines and OCEMS)
Validity
Authorisation valid for 5 years; Environmental Clearance as per its terms; post-closure monitoring of landfills continues for decades

A Treatment, Storage and Disposal Facility for hazardous waste — whether a common facility serving an industrial region or a captive landfill or incinerator for a large generator — is among the most heavily regulated projects in Indian environmental law, needing Environmental Clearance, consents and a specific authorisation from the SPCB under the Hazardous and Other Wastes Rules. We manage the full approval chain and the design, monitoring and record systems the authorisation imposes.

Legal basis: Rules 6 and 16 of the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016; CPCB guidelines for common hazardous waste TSDFs, secure landfills and incinerators; EIA Notification, 2006 (Item 7(d)) under the Environment (Protection) Act, 1986

Who needs it

  • Developers and operators of common hazardous waste TSDFs with secure landfill, incineration or stabilisation units
  • Large industrial groups, refineries, petrochemical and pharma clusters building captive secure landfills or incinerators
  • Industrial estate authorities and state industrial development corporations identifying sites under Rule 16
  • Existing TSDFs expanding cells, adding incinerators or renewing authorisation
  • Co-processing and pre-processing facilities that store and blend hazardous waste for cement kilns

Common in:Manufacturing & Industrial UnitsRecyclers & Waste ProcessorsPharma & ChemicalsReal Estate & Infrastructure

Documents required

  1. 1Site suitability study — hydrogeology, soil, flood, seismic and buffer-zone assessments as per CPCB siting criteria
  2. 2Environmental Impact Assessment report and Environmental Clearance (Category A or B under Item 7(d) of the EIA Notification, 2006)
  3. 3Consent to Establish and Consent to Operate
  4. 4Detailed engineering design of secure landfill (liner system, leachate collection, final cover), incinerator (combustion, APCD, stack) and stabilisation / solidification unit
  5. 5Waste acceptance criteria, fingerprint analysis protocol and laboratory facilities
  6. 6Groundwater monitoring well network and baseline monitoring data
  7. 7OCEMS installation details for incinerator stacks and effluent
  8. 8Emergency response plan, fire protection and occupational health arrangements
  9. 9Financial assurance / closure and post-closure care plan
  10. 10Constitution documents, land title or lease, and agreements with member industries

Missing something? We help you obtain or regularise supporting documents before filing.

How we get it done

  1. 1

    Siting and feasibility

    Day 1–30

    We evaluate the site against CPCB siting criteria, estimate the waste catchment and define the treatment and disposal configuration.

  2. 2

    EIA and Environmental Clearance

    Day 31–240

    Scoping, baseline studies, EIA report, public hearing and appraisal are managed with an accredited EIA consultant through to clearance.

  3. 3

    Consent to Establish

    Day 120–200

    The CTE application is filed with detailed engineering designs and the EC conditions.

  4. 4

    Construction oversight and authorisation

    Day 200–330

    Liner quality assurance, incinerator commissioning and OCEMS connectivity are documented, and the Form 1 authorisation and CTO applications are filed.

  5. 5

    Operating systems

    Day 330–365

    Waste acceptance, fingerprinting, manifest reconciliation, groundwater monitoring, Form 4 returns and member-industry reporting are set up before the first consignment.

If you don’t comply

Operating a hazardous waste disposal facility without authorisation or Environmental Clearance invites prosecution under Section 15 of the Environment (Protection) Act, 1986, closure directions under Section 5 and substantial Environmental Compensation; the NGT has imposed compensation running into crores on TSDF operators for groundwater contamination and liner failures. Rule 20 also makes the operator liable for remediation of any damage caused.

Why MYDA Group

  • Specialists, not generalists

    Environmental compliance is our only practice, so your file is handled by people who do this every day.

  • Fixed fee, written scope

    You know the professional fee and the statutory fees before we start. No surprise add-ons.

  • Inspection and audit-ready

    We prepare your site and team for the board visit or certification audit and attend it with you.

  • Lifetime reminders

    Every condition, return and renewal goes into your compliance calendar with alerts.

Frequently asked questions

Is a TSDF Category A or Category B under the EIA Notification?

Under Item 7(d), integrated facilities with incineration and landfill, or incineration alone, are Category A and appraised by MoEFCC; facilities with only a secure landfill are Category B and appraised by the SEIAA. The category affects timelines and the scope of the EIA.

What design standards apply to the secure landfill?

CPCB's guidelines prescribe a composite liner system with compacted clay and HDPE geomembrane, leachate collection and detection layers, a final cover system, groundwater monitoring wells and specific siting buffers from habitation, water bodies and flood plains. Construction quality assurance records are part of the authorisation file.

How long must we monitor after the landfill closes?

Post-closure care — final cover maintenance, leachate management and groundwater monitoring — is required for a long period after closure, typically 30 years under CPCB guidelines, and the authorisation requires a funded closure and post-closure plan.

Can a large generator build a captive landfill instead of using a common TSDF?

Yes, where the waste volumes justify it and a suitable site is available, a captive TSDF can be authorised under the same Rules. It carries the same EC, design and monitoring obligations, so the economics usually make sense only for very large or remote generators.

Often needed alongside

Waste Authorizations

Hazardous Waste Authorization

Any occupier who generates, stores, transports, uses or disposes of hazardous waste listed in the Hazardous and Other Wastes Rules needs an authorisation from the State Pollution Control Board in Form 2, valid for five years. We prepare the Form 1 application, set up your storage area, manifests and Form 3 register, and file the Form 4 annual return every 30 June.

Starting price
From ₹35,000
Turnaround
30–120 working days

EIA & Clearances

Environmental Clearance (EC)

Prior Environmental Clearance is the statutory permission for any project listed in the EIA Notification, 2006 before construction or expansion begins. Whether your project is appraised centrally by the MoEFCC or by your State authority, we prepare the application on PARIVESH, present it to the committee, respond to each query and track the clearance until the letter is issued and conditions are mapped for compliance.

Starting price
From ₹3,00,000
Turnaround
90–240 working days

EIA & Clearances

Environmental Impact Assessment (EIA) Study

An EIA study is the scientific backbone of your Environmental Clearance: one season of baseline data, impact prediction and an Environment Management Plan, prepared under Terms of Reference issued by the MoEFCC or SEIAA. We scope the study, run the monitoring through NABL-accredited laboratories and coordinate the NABET/QCI-accredited consultant so the report survives scrutiny at the Expert Appraisal Committee.

Starting price
From ₹2,50,000
Turnaround
120–240 working days